Four Bridges Under Construction in Chuberi

Four 100t capacity bridges are currently being constructed in the Chuberi administrative unit of Mestia municipality. The mentioned works are implemented within the framework of the Nenskra Hydropower Plant (HPP) project. The works are carried out by the JSC Nenskra Hydro subcontractor  Georgian Construction Consortium.

Preparatory works for the construction of the Nenskra HPP involve the construction of 14 bridges and  45 km of roads. The main construction works to start in 2020.

Nenskra HPP infrastructure will include two tunnels. The Nakra transfer tunnel connects Nakra valley with Nenskra valley, it will divert water from the Nakra weir into the Nenskra reservoir. The Nenskra headrace tunnel will connect the reservoir with the powerhouse.

JSC Nenskra Hydro will use the latest technology for excavation of Nenskra HPP tunnels, namely, the two Double Shield TBMs (Tunnel Boring Machines), custom made especially for JSC Nenskra Hydro by the German company Herrenknecht.

JSC Nenskra Hydro is a project-based company established in 2015 as a result of cooperation between a state-owned Korea Water Resources Corporation (K-water) and JSC Partnership Fund. The company is developing the Nenskra Hydropower Plant Project in the Nenskra and Nakra river Valleys in the Mestia Municipality of Samegrelo-Zemo Svaneti region. The 280 MW Nenskra Hydropower Plant will generate approximately 1’200.00 GWh of electricity annually, which will be fully consumed by the Georgian market.

25 October 2019 16:50